Energy network of the year: best collaboration

Relevant for: Distribution network operators (DNOs) and charge point operators (CPOs) who have formed a collaborative partnership to bring an EV charging infrastructure site online.

This award will provide recognition for a collaborative partnership (between a DNO and CPO).

Summary of suggested entry content: 

  • • Demonstrate how the charge point operator and distribution network operator have worked together
  • • Overall benefit of the collaboration
  • • Detail of efficiency, cost and carbon savings brought about through the collaboration

Criteria should include:

  • • Detail of the aims and objectives of the partnership and how they were approached
  • • Challenges and how were they overcome (e.g. speeding up connections to the grid; cross-sector collaboration; speed of putting EV charging infrastructure live)
  • • Wider benefits served by site, wider community and other stakeholders

*Collaborative project must have been completed on or after 1 September 2023, and prior to the close of this year’s nominations window (2 September 2024).

Closing date for entries is Monday 2 September at 17:00


Please complete the criteria sections below, up to a maximum of 500 words per criteria.

Drop your file here or click here to upload You can upload up to 5 files.

Sign up for our essential
newsletter service.

Enter your details here.