Sunday, September 8, 2024

Energy network of the year: best collaboration

Relevant for: Distribution network operators (DNOs) and charge point operators (CPOs) who have formed a collaborative partnership to bring an EV charging infrastructure site online.

This award will provide recognition for a collaborative partnership (between a DNO and CPO).

Summary of suggested entry content: 

  • • Demonstrate how the charge point operator and distribution network operator have worked together
  • • Overall benefit of the collaboration
  • • Detail of efficiency, cost and carbon savings brought about through the collaboration

Criteria should include:

  • • Detail of the aims and objectives of the partnership and how they were approached
  • • Challenges and how were they overcome (e.g. speeding up connections to the grid; cross-sector collaboration; speed of putting EV charging infrastructure live)
  • • Wider benefits served by site, wider community and other stakeholders

*Collaborative project must have been completed on or after 1 September 2023, and prior to the close of this year’s nominations window (2 September 2024).

Closing date for entries is Monday 9 September at 17:00


Please complete the criteria sections below, up to a maximum of 500 words per criteria.

Maximum of 500 words
Maximum of 500 words
Maximum of 500 words
Drop your file here or click here to upload You can upload up to 5 files.

Sign up for our essential
newsletter service.

Enter your details here.